Packaging
After production and quality inspection, each container house will be folded or packed according to its structure. Protective film and suitable packing materials are used to reduce scratches, dust, and damage during transportation.
The packed module is then transferred by forklift from the workshop to the loading area. Workers will guide the unit during the loading process to make sure it enters the container safely and smoothly.
Once the module is fully loaded into the container, it will be fixed and secured inside. The container is then sealed and prepared for delivery to the project site.


From Factory to Project Site
Our container houses are carefully packed after factory inspection. Each unit is protected, transferred by forklift, and loaded into the container safely. This helps reduce transportation risks and ensures the product is ready for installation after arrival.